The display building is under contruction. Just a plain off-the-shelf steel shed now. But no doubt, it will be dolled-up later.
The cowl is being laminated of genuine Dow Styrofoam, a product of Midland, Michigan. It will be hot wirc cut, then hand-sanded, then fibreglassed.
The last major part is the top wing, of which the ribs have been cut.
Also attached is an archive photo of Eddie's ride.
And., last but not least, FUN raising. It's turning into a $50,000 project, of which only a small part is in hand.