Was the original inspector asleep on the job. When I built the new shop it was inspected four times. The first time was before we could call the power company for an upgrade on a new line from the pole. The second time after KCP&L did the hookup and new meter. The third time was after I had did all my wiring in the shop itself. The final time was to see if I had removed the temporary flourescent light I had hooked up. Have fun, DOC Holliday