If the sheds real cold , it may take forever to cure .
Was Told the west sysyems base was same as ayraldite , but with space fillers to make it lighter .
Ayraldite it is critical to mix say thee times over a 20 minute interval . at zero Deg. C , it can take 48 Hrs to fully kick off .
I think you should sit it in the sun for a few days .
( was at the lecture in 60s when agent instructed pater on this new fangled aryldite , was actually " must be mixed for thirty minutes before use "
Q. you dont have to mix it for thirty bl**dy minutes , do you
A No , but you should stir it two or three times , over that ( many minutes )
SO , if its COLDER ( Than 16 Deg , which was wot the AEROLITE required as minimum ) it should be stirred ' in the pot ' of and on , for longer .
Of Course Heating in the pot , a jar in boiled water , gets it mixing & runney , quick . But itll kick off quick , so you need to be quick too , and prepared .
No time for hunting for ' now where did I . . . ,