General control line discussion => Open Forum => Topic started by: Mike Griffin on December 10, 2017, 04:29:35 PM
-
There is some additional material that I need to start the Imitation test build on the wing and fuselage but I had the laser cut parts for the tail section so thought I would build that. When Eric Rule returns from vacation on the 19th, I will have him send me the laser cut parts I need to continue the build.
In the meantime, here are some pictures of the stab and elevator construction.
Mike
-
The stab thickness is 3/8". Everything fit great during the test build. The framework sticks that form the leading and trailing edges of the stab and elevator are 3/8" x 1/2". The ribs are 1/4" x 3/8" stock. All this is included in the kit. It is easy to frame these parts right over the plan.
Mike
-
one more
-
Looks nice!
-
Looks good, now the hard part, sanding. LL~ LL~