Thanks for the compliments guys.
Dave: Yes, it was built using lost foam jigs. I drew every rib
and half rib using the pieces from the jig. If you can make the
ribs, then the plans show the location of each rib. Lay down the
bottom spar on your building table, jig up the trailing edge,
and go from there.
Steve