I got back from the Labor Day trip in the evening on 9/7. It was raining and water was already up above the record high water mark. Woke up at 3 am, it was coming up on the lawn. Ran around like crazy moving stuff upstairs, hoisted the laser cutter to the ceiling, and generally had a ball. By mid-day Thursday the water was 3 ft.. deep in the basement. It peaked Thursday night at about 28.6 ft., compared to the last peak of 16.1ft. We're a little further down stream and seem to have picked up another foot. 46 in. up the basement wall.
It will be at least two weeks before I can for sure send out any cores or laser cut parts. It'll take another week just to get all the mess cleaned up and see what equipment is working!
In the mean time, I'll get ready for the jaunt down to Huntersville.
Phil C