stunthanger.com
Building Tips and technical articles. => Building techniques => Topic started by: Bill Heher on November 27, 2011, 08:02:32 PM
-
1st try ended up with the stab tilted about 3/8". I went to harbor Freight and bought a couple more framing triangles. The are metal and have both metric and fractional scales on them. Paid less than $2 each - well worth it.
Here a couple of pics after I cut the stab loose and jigged it up to re-glue.