I have this Gee Bee R3 Build going on over at CFC Graphics. I'm almost done with the complete framing of the model except for one area. The cowling venting.
I have these Taiwanese louvers for this purpose because no matter how I approach the issue, I thought this was my best option.
These louvers have 12 holes for mounting each. I'd rather bypass that and sink them into the cowling and finish them off flush.
This would eliminate 24 holes, nuts and bolts, washers also. A bit more work but it would be a cleaner look when completed.
Bolt it or finished flush?
Just thought I'd run this by the Forum for advice or suggestions. Possibly someone has used these items?
Charles