Well tomorrow after a trip the the local HS I will go full guns. I need to catch Dave. The stage is set,ribs are cut,fuse doubler's are glued and the spar is complete. I have wrapped the bell crank lead outs. Leading and trailing edges are cut,tip plates are ready. I will probably set the skins into molds first so when I start it will only take a day or two to have a complete airframe.
(http://stunthanger.com/smf/index.php?action=dlattach;topic=31492.0;attach=127548;image)
Well tomorrow after a trip the the local HS I will go full guns. I need to catch Dave. The stage is set,ribs are cut,fuse doubler's are glued and the spar is complete. I have wrapped the bell crank lead outs. Leading and trailing edges are cut,tip plates are ready. I will probably set the skins into molds first so when I start it will only take a day or two to have a complete airframe.
(http://stunthanger.com/smf/index.php?action=dlattach;topic=31492.0;attach=127548;image)
Robert, if you are getting any FLYING done you are miles ahead of me. This is getting frustrating! Seven weeks, 5 1/2 days till the Walker Flyoff.
Dave