Tsunami waiting for the 1st flight after I made all the trim adjustments, which included adding tip weight, adding nose weight, adjusting leadouts, lowering the pushrod away from the hinge line, checked and adjusted engine thrust line, added washers under the engine lugs, resoldering the fill vent, added a forward facing tube into the slipstream, leaving the bottom overflow uncapped for flights, added the spinner, put fuel tubing over the NVA, raised tank 1/8" higher, and replaced all the old fuel tubing with new ones.